Data center in Donaustadt is an operational data center in Donaustadt, Austria. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.1 MW (range 0.8 MW to 5.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,344 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.23171, 16.46218 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 600 m away (Wiener Netze GmbH) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 380 kV, 5.9 km away |
| HV substations within 10 km | 32 |
| Power plants within 50 km | 3.3 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 117 g CO₂ per kWh (Austria, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6% |
| Industrial power price | EUR 0.150 per kWh (Austria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.5 °C (2001 to 2025) |
| Cooling degree days | 241 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.29 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Low (<10%) (Austria) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Donaustadt use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
How close is Data center in Donaustadt to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 600 m away.
How clean is the power for Data center in Donaustadt?
The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.
Data centers near Donaustadt
- Raiffeisen Informatik Data Center (RDC) 305 m
- Vienna International Center 3.3 km
- ODC21 (IBM colocation site) 4.9 km
- AtlasEdge DC Vienna VIE002 4.9 km
- A1 Next Generation Datacenter 4.9 km · 4.8 MW
- AtlasEdge DC Vienna VIE001 4.9 km
- ATOS Datacenter Siemens City 5.1 km
- Austria Campus 5.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.