Data center in Dubai Investments Park
Data center in Dubai Investments Park is an operational data center in Dubai Investments Park, United Arab Emirates. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 19 MW (range 9.5 MW to 30 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,876 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 25.02658, 55.18537 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 400 kV, 2.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 17 |
| Power plants within 50 km | 32 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 470 g CO₂ per kWh (United Arab Emirates, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6% |
Climate and water
| Average temperature | 28.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 3,778 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.67 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Extremely High (>80%) (Dubai) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Dubai Investments Park use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
How close is Data center in Dubai Investments Park to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 2.1 km away.
How clean is the power for Data center in Dubai Investments Park?
The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.
Data centers near Dubai Investments Park
- Equinix DX1 - Dubai 166 m · 13 MW
- datamena data center in Dubai Investments Park 171 m · 24 MW
- datamena DXA - Dubai 216 m
- Equinix DX2 - Dubai 407 m
- Khazna Data Centers 6.2 km · 34 MW
- Khazna Data Centers 6.5 km · 16 MW
- Data center in Jebel Ali 6.6 km · 25 MW
- Khazna Data Center - Ibn Battuta - DXB8 7.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.