Data Center Directory

Equinix DX1 - Dubai

Equinix DX1 - Dubai is an operational data center operated by Equinix in Dubai, United Arab Emirates. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power13 MW (range 6.5 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,833 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks88 networks, 3 internet exchanges
PeeringDB.
Also known asEquinix DX3 - Dubai · Equinix Dubai DX1
AddressInternational Media Production Zone (IMPZ), Building F90
Coordinates25.02618, 55.18695
Websiteequinix.com/data-centers/europe-colocation/united-arab-emirates-colocation/dubai-data-centers/dx1

Power and grid

Nearest high-voltage substationUnnamed substation, 400 kV, 2.2 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km17
Power plants within 50 km32 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity470 g CO₂ per kWh (United Arab Emirates, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 68%, nuclear 21.2%, solar 9.9%. Clean power: 31.6%

Climate and water

Average temperature28.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.6 °C (2001 to 2025)
Cooling degree days3,778 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.67 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayExtremely High (>80%) (Dubai)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix DX1 - Dubai use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Equinix DX1 - Dubai to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 2.2 km away.

How clean is the power for Equinix DX1 - Dubai?

The grid in United Arab Emirates emits about 470 g CO₂ per kWh (2025). Largest sources: gas 68%, nuclear 21.2%, solar 9.9%.

Who operates Equinix DX1 - Dubai?

Equinix.

Data centers near Dubai

More Equinix data centers

Sources

Correct this page or get the data