Data center in Geoje is an operational data center in Geoje, South Korea. Our footprint estimate of its power is about 4.2 MW.

Key facts

StatusOperational
Facility power4.2 MW (range 2.1 MW to 6.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,735 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates34.77776, 128.64097

Power and grid

Grid carbon intensity418 g CO₂ per kWh (South Korea, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 31.1%, nuclear 29.4%, gas 28%, solar 6%, bioenergy 3.2%. Clean power: 39.9%

Climate and water

Water stress todayLow - Medium (10-20%) (Gyeongsangnam-do)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Geoje use?

We estimate the facility power at about 4.2 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Geoje?

The grid in South Korea emits about 418 g CO₂ per kWh (2025). Largest sources: coal 31.1%, nuclear 29.4%, gas 28%.

Data centers near Geoje