Data center in Hutang
Data center in Hutang is an operational data center in Hutang, China. Our footprint estimate of its power is about 5.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.6 MW (range 2.8 MW to 9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,682 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.67614, 119.57173 |
Power and grid
| Grid carbon intensity | 528 g CO₂ per kWh (China, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 54.8%, hydro 13.3%, solar 11.2%, wind 10.7%, nuclear 4.6%. Clean power: 41.1% |
Climate and water
| Water stress today | Medium - High (20-40%) (Jiangsu) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Hutang use?
We estimate the facility power at about 5.6 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Hutang?
The grid in China emits about 528 g CO₂ per kWh (2025). Largest sources: coal 54.8%, hydro 13.3%, solar 11.2%.
Data centers near Hutang
- 江南农村商业银行数据中心 5.5 km · 3.9 MW
- Data center in Zhenzhou 72.1 km · 7.1 MW
- Data center in Zhenzhou 72.1 km · 7.1 MW
- Data center in Zhenzhou 72.6 km · 13 MW
- Data center in Zhenzhou 72.7 km · 13 MW
- Data center in Zhenzhou 72.8 km · 14 MW
- Data center in Zhenzhou 72.9 km · 12 MW
- Data center in Zhenzhou 72.9 km · 13 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.