Data center in Kawasan Penempatan Ulu Benut Lima
Data center in Kawasan Penempatan Ulu Benut Lima is an operational data center in Kawasan Penempatan Ulu Benut Lima, Malaysia. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 17 MW (range 8.7 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,561 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 1.70338, 103.41340 |
Power and grid
| Nearest high-voltage substation | Pencawang Masuk Utama Sedenak, 275 kV, 300 m away (Tenaga Nasional) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 3.2 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 3,296 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.59 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low (<10%) (Johor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Kawasan Penempatan Ulu Benut Lima use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Data center in Kawasan Penempatan Ulu Benut Lima to the power grid?
The nearest high-voltage substation in OpenStreetMap is Pencawang Masuk Utama Sedenak (275 kV), about 300 m away.
How clean is the power for Data center in Kawasan Penempatan Ulu Benut Lima?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Data centers near Kawasan Penempatan Ulu Benut Lima
- Data center in Kawasan Penempatan Ulu Benut Lima 173 m · 9.9 MW
- MY06 301 m
- Data center in Kawasan Penempatan Ulu Benut Lima 348 m · 24 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 517 m · 24 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 590 m · 12 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 656 m · 51 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 909 m · 44 MW
- Data center in Kawasan Penempatan Ulu Benut Lima 1.2 km · 40 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.