Data center in Kawasan Penempatan Ulu Benut Lima

Data center in Kawasan Penempatan Ulu Benut Lima is an operational data center in Kawasan Penempatan Ulu Benut Lima, Malaysia. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
Facility power12 MW (range 6.1 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,191 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates1.69882, 103.41069

Power and grid

Nearest high-voltage substationPencawang Masuk Utama Sedenak, 275 kV, 500 m away (Tenaga Nasional)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
Power plants within 50 km3.6 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,296 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.59 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow (<10%) (Johor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Kawasan Penempatan Ulu Benut Lima use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is Data center in Kawasan Penempatan Ulu Benut Lima to the power grid?

The nearest high-voltage substation in OpenStreetMap is Pencawang Masuk Utama Sedenak (275 kV), about 500 m away.

How clean is the power for Data center in Kawasan Penempatan Ulu Benut Lima?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.