Data center in Kragujevac
Data center in Kragujevac is an operational data center in Kragujevac, Serbia. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 12 MW (range 6.2 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,349 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Саве Ковачевића 35b |
| Coordinates | 44.02888, 20.92878 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 800 m away (Elektromreža Srbije) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 3.4 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 125 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 693 g CO₂ per kWh (Serbia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 65.1%, hydro 22.1%, gas 6.1%, wind 4.1%, solar 1.3%. Clean power: 28.5% |
| Industrial power price | EUR 0.134 per kWh (Serbia, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 405 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low - Medium (10-20%) (Serbia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Kragujevac use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is Data center in Kragujevac to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 800 m away.
How clean is the power for Data center in Kragujevac?
The grid in Serbia emits about 693 g CO₂ per kWh (2025). Largest sources: coal 65.1%, hydro 22.1%, gas 6.1%.
Data centers near Kragujevac
- A1 Data centar 527 m · 2.8 MW
- Državni Data Centar DDC 1.6 km
- Serbia BroadBand 89.4 km
- Telekom Srbija data centar 93.4 km
- BeotelNet Data Center 93.6 km
- Cetin Data Center 96.6 km
- Absolut Solutions 96.8 km
- PhoenixNAP BELGRADE 97.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.