Data center in Mint Hill
Data center in Mint Hill is an operational data center in Mint Hill, United States. Our footprint estimate of its power is about 9.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.5 MW (range 3.8 MW to 24 MW) Estimate from building footprint, low confidence. Footprint estimate: about 79,317 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 4,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.17949, -80.57018 |
Power and grid
| Utility | Union Electric Membership Corp (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 39.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 350 g CO₂ per kWh (North Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 39.7%, nuclear 31.5%, coal 13.1%, solar 10.1%, hydro 3.4%. Clean power: 46.9% |
| Industrial power price | USD 0.082 per kWh (North Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (North Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Mint Hill use?
We estimate the facility power at about 9.5 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Mint Hill?
The grid in North Carolina emits about 350 g CO₂ per kWh (2025). Largest sources: gas 39.7%, nuclear 31.5%, coal 13.1%.
Data centers near Mint Hill
- Flexential - Charlotte/North (CLT4/5) 24.4 km · 6.7 MW
- Digital Realty CLT (125 N Myers St) 24.5 km
- CENTRA CLT01 - Charlotte NC (701 E Trade) 24.7 km
- Cogent Charlotte 2 26.6 km
- Spectrum Charlotte National Data Center 31.7 km · 15 MW
- Carolina Internet / CaroNet 32.3 km
- DC74-CLT4 32.4 km · 1.6 MW
- ScaleMatrix Charlotte Data Center US-East 01 32.5 km · 13 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.