Мегафон data center in Novosibirsk
Мегафон data center in Novosibirsk is an operational data center operated by Мегафон in Novosibirsk, Russia. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Мегафон |
| Facility power | 3 MW (range 1.5 MW to 4.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,469 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Толмачёвская улица 19А к3 |
| Coordinates | 54.95874, 82.82898 |
Power and grid
| Nearest high-voltage substation | Кирзаводская, 110 kV, 600 m away (АО "РЭС") Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Тулинская, 220 kV, 4.7 km away |
| HV substations within 10 km | 22 |
| Power plants within 50 km | 2.9 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Average temperature | 0.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 116 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.1 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Мегафон data center in Novosibirsk use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How close is Мегафон data center in Novosibirsk to the power grid?
The nearest high-voltage substation in OpenStreetMap is Кирзаводская (110 kV), about 600 m away.
How clean is the power for Мегафон data center in Novosibirsk?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates Мегафон data center in Novosibirsk?
Мегафон.
Data centers near Novosibirsk
- Sinar 9.3 km
- Nextremum NSK-1 11.3 km · 2.8 MW
- Rostelecom Novosibirsk 15.3 km · 1.7 MW
- KeyPoint Novosibirsk 21.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.