Rostelecom Novosibirsk is an operational data center operated by Rostelecom in Novosibirsk, Russia. Our footprint estimate of its power is about 1.7 MW.

Key facts

StatusOperational
OperatorRostelecom
Facility power1.7 MW (range 0.8 MW to 2.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,413 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 730 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates55.07373, 82.96044

Power and grid

Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Average temperature0.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days116 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.1 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Rostelecom Novosibirsk use?

We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.

How clean is the power for Rostelecom Novosibirsk?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Who operates Rostelecom Novosibirsk?

Rostelecom.

Data centers near Novosibirsk

More Rostelecom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.