Data center in Rastede

Data center in Rastede is an operational data center in Rastede, Germany. Our footprint estimate of its power is about 0.5 MW.

Key facts

StatusOperational
Facility power0.5 MW (range 0.3 MW to 0.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 452 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSchafjückenweg 3, 26180, Rastede
Coordinates53.21844, 8.24339

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Rastede use?

We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Rastede?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Data centers near Rastede

Sources

Correct this page or get the data