EWE NETZ GmbH

EWE NETZ GmbH is an operational data center operated by EWE Netz in Oldenburg, Germany. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorEWE Netz
Facility power17 MW (range 8.5 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,532 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCloppenburger Straße 302, 26133, Oldenburg
Coordinates53.11192, 8.20977

Power and grid

Nearest high-voltage substationOldenburg Osternburg, 110 kV, 1.5 km away (Avacon Netz)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHuntorf, 220 kV, 15.9 km away
HV substations within 10 km9
Power plants within 50 km1.7 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.1 °C (2001 to 2025)
Cooling degree days70 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.87 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does EWE NETZ GmbH use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is EWE NETZ GmbH to the power grid?

The nearest high-voltage substation in OpenStreetMap is Oldenburg Osternburg (110 kV), about 1.5 km away.

How clean is the power for EWE NETZ GmbH?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates EWE NETZ GmbH?

EWE Netz.