Data center in Roermond
Data center in Roermond is an operational data center in Roermond, Netherlands. Our footprint estimate of its power is about 2.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.3 MW (range 1.2 MW to 3.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,922 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 980 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 1952 |
| Coordinates | 51.19115, 5.98938 |
Power and grid
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.6 °C (2001 to 2025) |
| Cooling degree days | 131 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Limburg) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Roermond use?
We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Roermond?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Data centers near Roermond
- Datacenter The Factory Roermond 2.1 km
- ILA/Regeneration site PoP-Maasbracht 7.2 km
- Unilogic Networks Datacenter Sittard 23.9 km
- Systemec Venlo DC19 23.9 km
- Penta Infra Geleen GLN01 26.1 km
- ZeroPlex DC01 26.2 km
- Rechenzentrum Hartmann GmbH & Co. KG 32.2 km · 1.9 MW
- ENGIE Cofely (Maastricht-Airport) 32.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.