Data center in Spanish Springs is an operational data center in Spanish Springs, United States. Our footprint estimate of its power is about 42 MW.

Key facts

StatusOperational
Facility power42 MW (range 21 MW to 67 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 34,809 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 18,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates39.56711, -119.54853

Power and grid

Nearest high-voltage substationApple Data Center, 120 kV, 800 m away (NV Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWest Tracy Substation, 345 kV, 1.8 km away
HV substations within 10 km16
UtilitySierra Pacific Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityNEVP
Nearest gas pipelineTuscarora Pipeline Co, interstate pipeline, 1.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity326 g CO₂ per kWh (Nevada, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, solar 33.6%, other renewables 8.2%, coal 5.5%, hydro 4%. Clean power: 46.7%
Industrial power priceUSD 0.102 per kWh (Nevada, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.2 °C (2001 to 2025)
Cooling degree days557 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.23 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayHigh (40-80%) (Nevada)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Spanish Springs use?

We estimate the facility power at about 42 MW. Estimate from building footprint, low confidence.

How close is Data center in Spanish Springs to the power grid?

The nearest high-voltage substation in OpenStreetMap is Apple Data Center (120 kV), about 800 m away. The local utility is Sierra Pacific Power Co, in the NEVP balancing area.

How clean is the power for Data center in Spanish Springs?

The grid in Nevada emits about 326 g CO₂ per kWh (2025). Largest sources: gas 48.3%, solar 33.6%, other renewables 8.2%.

Data centers near Spanish Springs