Data center in Wallingford
Data center in Wallingford is an operational data center in Wallingford, United States. Our footprint estimate of its power is about 4.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.9 MW (range 2.5 MW to 7.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,098 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Alexander Drive 20, 06492, Wallingford |
| Coordinates | 41.47881, -72.80101 |
Power and grid
| Utility | Town Of Wallingford (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 308 g CO₂ per kWh (Connecticut, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.1%, nuclear 36.9%, solar 5.5%, oil and other fossil 1.4%, bioenergy 1.3%. Clean power: 44.6% |
| Industrial power price | USD 0.162 per kWh (Connecticut, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.2 °C (2001 to 2025) |
| Cooling degree days | 422 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.91 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low (<10%) (Connecticut) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Wallingford use?
We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Wallingford?
The grid in Connecticut emits about 308 g CO₂ per kWh (2025). Largest sources: gas 54.1%, nuclear 36.9%, solar 5.5%.
Data centers near Wallingford
- HDC1 - 108 Bank St 21.7 km
- Lumen New Haven 22.5 km
- Lumen West Haven 25.3 km
- Ergonomic Group 30.9 km
- Lumen Hartford 31.7 km
- Crown Castle Hartford (960 Main) 33.9 km
- Aphorio Carter Trumbull Data Center 39.2 km · 32 MW
- SD / Comsat Southbury Ground Station 40.8 km