Data center in Wallingford is an operational data center in Wallingford, United States. Our footprint estimate of its power is about 4.9 MW.

Key facts

StatusOperational
Facility power4.9 MW (range 2.5 MW to 7.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,098 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAlexander Drive 20, 06492, Wallingford
Coordinates41.47881, -72.80101

Power and grid

UtilityTown Of Wallingford (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineAlgonquin Gas Trans Co, interstate pipeline, 2.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity308 g CO₂ per kWh (Connecticut, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.1%, nuclear 36.9%, solar 5.5%, oil and other fossil 1.4%, bioenergy 1.3%. Clean power: 44.6%
Industrial power priceUSD 0.162 per kWh (Connecticut, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.2 °C (2001 to 2025)
Cooling degree days422 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.91 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayLow (<10%) (Connecticut)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Wallingford use?

We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Wallingford?

The grid in Connecticut emits about 308 g CO₂ per kWh (2025). Largest sources: gas 54.1%, nuclear 36.9%, solar 5.5%.