Data4 Italia - Campus MIL01 - DCL09
Data4 Italia - Campus MIL01 - DCL09 is an operational data center operated by Data4 Italia in Settimo Milanese, Italy. Our footprint estimate of its power is about 9.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Data4 Italia |
| Facility power | 9.1 MW (range 4.6 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,619 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Data4 Italia - Campus MIL01 - DCL07 · Data4 Italia - Campus MIL01 - DC05 · Data4 Italia - Campus MIL01 - DC06 · Data4 Italia - Campus MIL01 - DC10 |
| Coordinates | 45.47226, 9.03899 |
Power and grid
| Nearest high-voltage substation | UT Italtel, 132 kV, 600 m away (Italtel) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Baggio, 380 kV, 1.7 km away |
| HV substations within 10 km | 37 |
| Power plants within 50 km | 5.6 GW in 19 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.2 °C (2001 to 2025) |
| Cooling degree days | 482 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 3 m/s average |
| Water stress today | High (40-80%) (Italy) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data4 Italia - Campus MIL01 - DCL09 use?
We estimate the facility power at about 9.1 MW. Estimate from building footprint, low confidence.
How close is Data4 Italia - Campus MIL01 - DCL09 to the power grid?
The nearest high-voltage substation in OpenStreetMap is UT Italtel (132 kV), about 600 m away.
How clean is the power for Data4 Italia - Campus MIL01 - DCL09?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates Data4 Italia - Campus MIL01 - DCL09?
Data4 Italia.
Data centers near Settimo Milanese
- Data4 Italia - Campus MIL01 - DC03 260 m · 3.2 MW
- Equinix ML5 - Milan 352 m · 8.5 MW
- DATA4 Milan-Cornaredo - MIL1 1.1 km
- Retelit Avalon 2 2.4 km
- EXA Edge DC Milan 4.9 km
- UNO-NX01 5.0 km
- Telnet Caldera Milan 5.1 km
- Seeweb Milano Caldera 5.2 km
More Data4 Italia data centers
Sources