Data Center Directory

Datacenter Hannover

Datacenter Hannover is an operational data center operated by envia TEL in Sehnde, Germany. Our footprint estimate of its power is about 2.6 MW.

Key facts

StatusOperational
Operatorenvia TEL
Facility power2.6 MW (range 1.3 MW to 4.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,160 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAvacon AG Data Center Sehnde
AddressHedwig-Kohn-Str. 3, 31319 Sehnde
Coordinates52.32038, 9.98529
Websiteenviatel.de/geschaeftskunden/datacenter/standorte/datacenter-hannover

Power and grid

Nearest high-voltage substationSehnde, 110 kV, 300 m away (Avacon Netz)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Algermissen, 380 kV, 6.6 km away
HV substations within 10 km15
Power plants within 50 km1.2 GW in 20 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.2 °C (2001 to 2025)
Cooling degree days102 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter Hannover use?

We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.

How close is Datacenter Hannover to the power grid?

The nearest high-voltage substation in OpenStreetMap is Sehnde (110 kV), about 300 m away.

How clean is the power for Datacenter Hannover?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates Datacenter Hannover?

envia TEL.

Data centers near Sehnde

More envia TEL data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.