htp Rechenzentrum Lehrte RZ2
htp Rechenzentrum Lehrte RZ2 is an operational data center operated by htp in Lehrte, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | htp |
| Networks | 1 networks PeeringDB. |
| Address | Raiffeisenstrasse 10a |
| Coordinates | 52.36163, 9.91354 |
| Website | htp.net |
Power and grid
| Nearest high-voltage substation | Umspannwerk Ahlten, 220 kV, 1.2 km away (enercity Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 19 |
| Power plants within 50 km | 924 MW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.2 °C (2001 to 2025) |
| Cooling degree days | 102 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is htp Rechenzentrum Lehrte RZ2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Ahlten (220 kV), about 1.2 km away.
How clean is the power for htp Rechenzentrum Lehrte RZ2?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates htp Rechenzentrum Lehrte RZ2?
htp.
Data centers near Lehrte
- GRASS-MERKUR Hannover 3.5 km · 1.4 MW
- Datacenter Hannover 6.7 km · 2.6 MW
- EXA Edge DC Hannover 7.8 km
- htp Rechenzentrum Hannover TZ 7.8 km
- net.DE DC-H3 8.0 km
- kyberio GmbH 9.6 km
- euNetworks Colocation Hannover 10.6 km
- nLighten Hanover HAJ1 13.1 km
More htp data centers
- htp Rechenzentrum Hannover TZ Germany
- PoP-Hauptverteiler Germany
- PoP-Hauptverteiler Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.