Data Center Directory

Datacenter Weidach

Datacenter Weidach is an operational data center operated by Vorarlberger Informatik- und Telekommunikationsdienstleistungsgesellschaft mbH in Bregenz, Austria. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorVorarlberger Informatik- und Telekommunikationsdienstleistungsgesellschaft mbH
Networks1 networks, 1 internet exchanges
PeeringDB.
AddressWeidachstrasse 10
Coordinates47.48863, 9.73827
Websitevtg.at

Power and grid

Nearest high-voltage substationUmspannwerk Rieden, 110 kV, 200 m away (Vorarlberger Energienetze GmbH)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUmspannwerk Werben - Dornbirn, 220 kV, 6.4 km away
HV substations within 10 km12
Power plants within 50 km1.2 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity117 g CO₂ per kWh (Austria, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 51.9%, solar 14.1%, gas 11.9%, wind 11.4%, bioenergy 6.3%. Clean power: 83.6%
Industrial power priceEUR 0.150 per kWh (Austria, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.6 °C (2001 to 2025)
Cooling degree days95 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.4 kWh per m² per day
Wind at 50 m3.9 m/s average
Water stress todayLow (<10%) (Vorarlberg)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is Datacenter Weidach to the power grid?

The nearest high-voltage substation in OpenStreetMap is Umspannwerk Rieden (110 kV), about 200 m away.

How clean is the power for Datacenter Weidach?

The grid in Austria emits about 117 g CO₂ per kWh (2025). Largest sources: hydro 51.9%, solar 14.1%, gas 11.9%.

Who operates Datacenter Weidach?

Vorarlberger Informatik- und Telekommunikationsdienstleistungsgesellschaft mbH.

Data centers near Bregenz

Sources

Correct this page or get the data