DataPro VI
DataPro VI is an operational data center operated by DataPro in Ochakovo-Matveyevskoye, Russia. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DataPro |
| Facility power | 31 MW (range 15 MW to 49 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,491 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | DataPro III |
| Address | Рябиновая улица 53 с2 |
| Coordinates | 55.69365, 37.42895 |
| Website | en.datapro.ru/data-centers/datapro-moscow-vi |
Power and grid
| Nearest high-voltage substation | Очаково, 500 kV, 1 km away (ПАО "ФСК ЕЭС") Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 58 |
| Power plants within 50 km | 13 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Average temperature | 4.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 92 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.86 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DataPro VI use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How close is DataPro VI to the power grid?
The nearest high-voltage substation in OpenStreetMap is Очаково (500 kV), about 1 km away.
How clean is the power for DataPro VI?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates DataPro VI?
DataPro.
Data centers near Ochakovo-Matveyevskoye
- DataPro IV 285 m · 8.6 MW
- SYNTERRA DataCenter 4.6 km
- Moscow M9 7.7 km
- RTP MK15 8.1 km
- 3data B17 8.6 km
- SPACE-IX 8.9 km
- FREEnet BNS00 9.0 km
- MSTN LLC 9.5 km
More DataPro data centers
- DataPro IV Russia
- DataPro Moscow II Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.