Dataxion France DTX01
Dataxion France DTX01 is an operational data center operated by EASYTEAM (ex DATAXION) in Trappes, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EASYTEAM (ex DATAXION) |
| Networks | 1 networks PeeringDB. |
| Address | 16 avenue Jean d'Alembert |
| Coordinates | 48.79653, 1.98491 |
| Website | dataxion-france.fr |
Power and grid
| Nearest high-voltage substation | Poste électrique de la Vérinnerie, 225 kV, 3.2 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.2 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 106 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Dataxion France DTX01 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de la Vérinnerie (225 kV), about 3.2 km away.
How clean is the power for Dataxion France DTX01?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Dataxion France DTX01?
EASYTEAM (ex DATAXION).
Data centers near Trappes
- Datacenter Thales Nungesser 940 m
- Airbus data center in Élancourt 1.1 km · 17 MW
- Allianz data center in Élancourt 2.4 km · 7.3 MW
- Site technique SFR 3.4 km · 2.9 MW
- Groupe Cyllene - DC - Montigny les Bretonneux 3.4 km
- Site technique SFR 3.7 km · 3.7 MW
- Datacenter Bouygues Télécom 3.7 km · 9.8 MW
- Datacenter RTE 4.8 km