DC West
DC West is an operational data center operated by DC West in Perth, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | DC West |
| Address | 234 Pier Street |
| Coordinates | -31.95003, 115.86548 |
| Website | dcwest.net.au |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 17.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.8 °C (2001 to 2025) |
| Cooling degree days | 914 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.6 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Medium - High (20-40%) (Western Australia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for DC West?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates DC West?
DC West.
Data centers near Perth
- NEXTDC P2 256 m · 48 MW
- aCure 876 m
- Equinix PE1 - Perth 1.1 km
- Vocus Perth PER01 1.1 km
- QV.1 Perth 1.4 km
- Pawsey Supercomputing Centre Setonix 5.0 km · 0.8 MW
- PureColo PER01 (Perth) 5.5 km
- Data center in East Victoria Park 5.6 km · 2.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.