Data Center Directory

NEXTDC P2

NEXTDC P2 is an operational data center operated by NEXTDC in Perth, Australia. Our footprint estimate of its power is about 48 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power48 MW (range 24 MW to 77 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,658 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 21,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks53 networks, 3 internet exchanges
PeeringDB.
Also known asNextDC P2 Perth Data Centre
Address105 Lord Street
Coordinates-31.95009, 115.86819
Websitenextdc.com

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature17.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.8 °C (2001 to 2025)
Cooling degree days914 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.6 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayMedium - High (20-40%) (Western Australia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NEXTDC P2 use?

We estimate the facility power at about 48 MW. Estimate from building footprint, low confidence.

How clean is the power for NEXTDC P2?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates NEXTDC P2?

NEXTDC.

Data centers near Perth

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.