NEXTDC P2
NEXTDC P2 is an operational data center operated by NEXTDC in Perth, Australia. Our footprint estimate of its power is about 48 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 48 MW (range 24 MW to 77 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,658 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 21,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 53 networks, 3 internet exchanges PeeringDB. |
| Also known as | NextDC P2 Perth Data Centre |
| Address | 105 Lord Street |
| Coordinates | -31.95009, 115.86819 |
| Website | nextdc.com |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 17.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.8 °C (2001 to 2025) |
| Cooling degree days | 914 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.6 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Medium - High (20-40%) (Western Australia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC P2 use?
We estimate the facility power at about 48 MW. Estimate from building footprint, low confidence.
How clean is the power for NEXTDC P2?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates NEXTDC P2?
NEXTDC.
Data centers near Perth
- DC West 256 m
- Equinix PE1 - Perth 849 m
- aCure 1.1 km
- Vocus Perth PER01 1.3 km
- QV.1 Perth 1.6 km
- Pawsey Supercomputing Centre Setonix 5.0 km · 0.8 MW
- PureColo PER01 (Perth) 5.3 km
- Data center in East Victoria Park 5.5 km · 2.8 MW
More NEXTDC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.