Data Center Directory

NEXTDC D1

NEXTDC D1 is an operational data center operated by NEXTDC in Darwin, Australia. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power1.5 MW (range 0.8 MW to 2.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,272 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks, 1 internet exchanges
PeeringDB.
Also known asNEXTDC Darwin D1
Address2 Harvey Street
Coordinates-12.45675, 130.84357
Websitenextdc.com

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature27.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.4 °C (2001 to 2025)
Cooling degree days3,615 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.85 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayLow - Medium (10-20%) (Northern Territory)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NEXTDC D1 use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

How clean is the power for NEXTDC D1?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates NEXTDC D1?

NEXTDC.

Data centers near Darwin

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.