NEXTDC S3 is an operational data center operated by NEXTDC in Artarmon, Australia. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,869 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 20 networks, 2 internet exchanges PeeringDB. |
| Also known as | NEXTDC - S3 Sydney |
| Address | 2 Broadcast Way |
| Coordinates | -33.81934, 151.18503 |
| Website | nextdc.com |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC S3 use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How clean is the power for NEXTDC S3?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates NEXTDC S3?
NEXTDC.
Data centers near Artarmon
- Keppel Data Centres | Keppel DC Sydney 1 84 m · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 138 m · 4.5 MW
- Telstra InfraCo - St Leonards Data Centre 595 m · 25 MW
- Syncom S4 761 m
- Data center in Artarmon 907 m
- AirTrunk Sydney North 3.9 km · 26 MW
- TPG Data Centre 5.2 km
- Powertel Data Centre 5.4 km
More NEXTDC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.