AirTrunk Sydney North
AirTrunk Sydney North is an operational data center operated by AirTrunk in Lane Cove North, Australia. Our footprint estimate of its power is about 26 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | AirTrunk |
| Facility power | 26 MW (range 13 MW to 41 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,370 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.80775, 151.14473 |
Power and grid
| Nearest high-voltage substation | Lane Cove Zone Substation, 132 kV, 400 m away (Ausgrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Haymarket Bulk Supply Substation, 330 kV, 9.8 km away |
| HV substations within 10 km | 35 |
| Power plants within 50 km | 179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AirTrunk Sydney North use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
How close is AirTrunk Sydney North to the power grid?
The nearest high-voltage substation in OpenStreetMap is Lane Cove Zone Substation (132 kV), about 400 m away.
How clean is the power for AirTrunk Sydney North?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AirTrunk Sydney North?
AirTrunk.
Data centers near Lane Cove North
- Fujitsu North Ryde 2.6 km · 14 MW
- NEXTDC S1 2.8 km · 34 MW
- NEXTDC S2 3.1 km · 7.8 MW
- Intellicentre 2 (IC2) 3.4 km · 7.2 MW
- AWS Asia Pacific (Sydney) Region Data Centre 3.5 km · 15 MW
- NEXTDC S3 3.9 km · 13 MW
- Keppel Data Centres | Keppel DC Sydney 1 4.0 km · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 4.1 km · 4.5 MW
More AirTrunk data centers
- AirTrunk Singapore SGP1 Singapore
- 2B棟 Japan
- AirTrunk data center in Derrimut Australia
- AirTrunk SYD3 Sydney West Australia
- AirTrunk SYD1 Sydney West Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.