Intellicentre 2 (IC2)

Intellicentre 2 (IC2) is an operational data center operated by Macquarie Corporate Telecommunications in Macquarie Park, Australia. Our footprint estimate of its power is about 7.2 MW.

Key facts

StatusOperational
OperatorMacquarie Corporate Telecommunications
Facility power7.2 MW (range 3.6 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,982 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks5 networks, 1 internet exchanges
PeeringDB.
Also known asIntellicentre 3 (IC3) · Intellicentre 2 · Intellicentre 3 East
Address17-23 Talavera Road
Coordinates-33.78084, 151.12727
Websitemacquariedatacentres.com

Power and grid

Nearest high-voltage substationMacquarie Park Zone Substation, 132 kV, 800 m away (Ausgrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSydney East Bulk Supply Substation, 330 kV, 9.7 km away
HV substations within 10 km25
Power plants within 50 km179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Intellicentre 2 (IC2) use?

We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.

How close is Intellicentre 2 (IC2) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Macquarie Park Zone Substation (132 kV), about 800 m away.

How clean is the power for Intellicentre 2 (IC2)?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Intellicentre 2 (IC2)?

Macquarie Corporate Telecommunications.

Data centers near Macquarie Park

More Macquarie Corporate Telecommunications data centers

Sources