Data Center Directory

Fujitsu North Ryde

Fujitsu North Ryde is an operational data center operated by Fujitsu Australia in Macquarie Park, Australia. Our footprint estimate of its power is about 14 MW.

Key facts

StatusOperational
OperatorFujitsu Australia
Facility power14 MW (range 6.9 MW to 22 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,507 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks, 2 internet exchanges
PeeringDB.
Also known asFujitsu North Ryde Data Centre
Address23-25 Waterloo Rd, Macquarie Park NSW 2113
Coordinates-33.78675, 151.13186
Websitefujitsu.com/au/services/data-centres

Power and grid

Nearest high-voltage substationMacquarie Park Zone Substation, 132 kV, 100 m away (Ausgrid)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSydney East Bulk Supply Substation, 330 kV, 9.8 km away
HV substations within 10 km26
Power plants within 50 km179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Fujitsu North Ryde use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

How close is Fujitsu North Ryde to the power grid?

The nearest high-voltage substation in OpenStreetMap is Macquarie Park Zone Substation (132 kV), about 100 m away.

How clean is the power for Fujitsu North Ryde?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Fujitsu North Ryde?

Fujitsu Australia.

Data centers near Macquarie Park

More Fujitsu Australia data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.