Data Center Directory

NEXTDC S1

NEXTDC S1 is an operational data center operated by NEXTDC in Sydney, Australia. Our footprint estimate of its power is about 34 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power34 MW (range 17 MW to 54 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,370 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks105 networks, 3 internet exchanges
PeeringDB.
Also known asNEXTDC - S1 Sydney
Address4 Eden Park Drive, Macquarie Park
Coordinates-33.78526, 151.13149
Websitenextdc.com

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature18.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.9 °C (2001 to 2025)
Cooling degree days673 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (New South Wales)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NEXTDC S1 use?

We estimate the facility power at about 34 MW. Estimate from building footprint, low confidence.

How clean is the power for NEXTDC S1?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates NEXTDC S1?

NEXTDC.

Data centers near Sydney

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.