NEXTDC S1
NEXTDC S1 is an operational data center operated by NEXTDC in Sydney, Australia. Our footprint estimate of its power is about 34 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 34 MW (range 17 MW to 54 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,370 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 105 networks, 3 internet exchanges PeeringDB. |
| Also known as | NEXTDC - S1 Sydney |
| Address | 4 Eden Park Drive, Macquarie Park |
| Coordinates | -33.78526, 151.13149 |
| Website | nextdc.com |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC S1 use?
We estimate the facility power at about 34 MW. Estimate from building footprint, low confidence.
How clean is the power for NEXTDC S1?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates NEXTDC S1?
NEXTDC.
Data centers near Sydney
- Fujitsu North Ryde 169 m · 14 MW
- NEXTDC S2 572 m · 7.8 MW
- Intellicentre 2 (IC2) 627 m · 7.2 MW
- AWS Asia Pacific (Sydney) Region Data Centre 780 m · 15 MW
- AirTrunk Sydney North 2.8 km · 26 MW
- NEXTDC S3 6.2 km · 13 MW
- Keppel Data Centres | Keppel DC Sydney 1 6.3 km · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 6.4 km · 4.5 MW