Data Center Directory

NEXTDC C1

NEXTDC C1 is an operational data center operated by NEXTDC in Bruce, Australia. Our footprint estimate of its power is about 6.8 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power6.8 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,679 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks19 networks, 2 internet exchanges
PeeringDB.
Also known asCanberra 1
Address19 Battye Street
Coordinates-35.24531, 149.09624
Websitenextdc.com

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days433 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.92 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayMedium - High (20-40%) (Australian Capital Territory)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NEXTDC C1 use?

We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.

How clean is the power for NEXTDC C1?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates NEXTDC C1?

NEXTDC.

Data centers near Bruce

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.