TransACT Telehouse
TransACT Telehouse is an operational data center operated by Vocus in Canberra, Australia. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vocus |
| Facility power | 0.9 MW (range 0.5 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 753 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 12 networks, 2 internet exchanges PeeringDB. |
| Address | 470 Northbourne Ave, Dickson |
| Coordinates | -35.25185, 149.13393 |
| Website | transact.com.au/business/datacentre.aspx |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 2.4 km away (Evoenergy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 330 kV, 12.9 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 421 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.3 °C (2001 to 2025) |
| Cooling degree days | 133 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.79 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Medium - High (20-40%) (Australian Capital Territory) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TransACT Telehouse use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
How close is TransACT Telehouse to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 2.4 km away.
How clean is the power for TransACT Telehouse?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates TransACT Telehouse?
Vocus.
Data centers near Canberra
- NEXTDC C1 3.5 km · 6.8 MW
- ADC Mitchell 4.6 km · 7.4 MW
- Equinix CA1 - Canberra 4.8 km · 5.8 MW
- Intellicentre 4 Bunker 8.3 km · 3.1 MW
- Verizon data center in Narrabundah 8.8 km · 2.4 MW
- Fyshwick 2 10.6 km · 13 MW
- CDC Canberra FY1 10.6 km
- Department of Defence data center in Queanbeyan 12.4 km · 6.7 MW
More Vocus data centers
- AAPT Richmond (Melbourne) Australia
- PIPE Networks Melbourne Australia
- Soul DataCentre Australia
- AAPT Adelaide Australia
- AAPT Brisbane Australia
- AAPT Fortitude Valley Australia
- AAPT Glebe Australia
- aCure Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.