AAPT Richmond (Melbourne)
AAPT Richmond (Melbourne) is an operational data center operated by Vocus in Richmond, Australia. Our footprint estimate of its power is about 3.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vocus |
| Facility power | 3.9 MW (range 1.9 MW to 6.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,231 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | AAPT Data Centre |
| Address | 180 Burnley St |
| Coordinates | -37.82017, 145.00775 |
| Website | aapt.com.au |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AAPT Richmond (Melbourne) use?
We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.
How clean is the power for AAPT Richmond (Melbourne)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates AAPT Richmond (Melbourne)?
Vocus.
Data centers near Richmond
- Southgate Melbourne 3.9 km · 57 MW
- Powertel Data Centre 4.1 km · 2.1 MW
- Datacom Data Centre 4.1 km · 2.1 MW
- 5GN Melbourne Data Centre (MDC) 4.5 km
- PIPE Networks Melbourne 4.5 km · 1.8 MW
- Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) 5.0 km · 2.3 MW
- Soul DataCentre 6.0 km · 1.1 MW
- Interactive Melbourne 6.5 km · 3.5 MW
More Vocus data centers
- PIPE Networks Melbourne Australia
- Soul DataCentre Australia
- TransACT Telehouse Australia
- AAPT Adelaide Australia
- AAPT Brisbane Australia
- AAPT Fortitude Valley Australia
- AAPT Glebe Australia
- aCure Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.