Soul DataCentre

Soul DataCentre is an operational data center operated by Vocus in North Melbourne, Australia. Our footprint estimate of its power is about 1.1 MW.

Key facts

StatusOperational
OperatorVocus
Facility power1.1 MW (range 0.5 MW to 1.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 893 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 470 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asTPG Data Centre
Address222 Dryburgh Street
Coordinates-37.80121, 144.94409
Websitesoulaustralia.com.au

Power and grid

Nearest high-voltage substationUnnamed substation, 220 kV, 800 m away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Soul DataCentre use?

We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.

How close is Soul DataCentre to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 800 m away.

How clean is the power for Soul DataCentre?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Soul DataCentre?

Vocus.

Data centers near North Melbourne

More Vocus data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.