Data Center Directory

Equinix ME1/ME2 - Melbourne

Equinix ME1/ME2 - Melbourne is an operational data center operated by Equinix in Melbourne, Australia. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power13 MW (range 6.3 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,567 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks138 networks, 6 internet exchanges
PeeringDB.
Also known asEquinix ME1 · Equinix ME2
Address600 Lorimer Street, Port Melbourne
Coordinates-37.82168, 144.91546
Websiteequinix.com/locations/asia-colocation/australia-colocation/melbourne-data-centers/me1

Power and grid

Nearest high-voltage substationFishermans Bend Terminal Station, 220 kV, 1.3 km away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix ME1/ME2 - Melbourne use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Equinix ME1/ME2 - Melbourne to the power grid?

The nearest high-voltage substation in OpenStreetMap is Fishermans Bend Terminal Station (220 kV), about 1.3 km away.

How clean is the power for Equinix ME1/ME2 - Melbourne?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix ME1/ME2 - Melbourne?

Equinix.

Data centers near Melbourne

More Equinix data centers

Sources

Correct this page or get the data