Interactive Melbourne
Interactive Melbourne is an operational data center operated by Interactive in Port Melbourne, Australia. Our footprint estimate of its power is about 3.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Interactive |
| Facility power | 3.5 MW (range 1.8 MW to 5.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,935 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks, 1 internet exchanges PeeringDB. |
| Also known as | Interactive 2 Data Centre |
| Address | 461 Williamstown Road |
| Coordinates | -37.83270, 144.93555 |
| Website | interactive.com.au |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Interactive Melbourne use?
We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.
How clean is the power for Interactive Melbourne?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Interactive Melbourne?
Interactive.
Data centers near Port Melbourne
- NEXTDC M1 1.3 km · 10 MW
- Equinix ME1/ME2 - Melbourne 2.1 km · 13 MW
- PIPE Networks Melbourne 2.4 km · 1.8 MW
- Datacom Data Centre 2.5 km · 2.1 MW
- 5GN Melbourne Data Centre (MDC) 2.5 km
- Southgate Melbourne 2.6 km · 57 MW
- Powertel Data Centre 2.8 km · 2.1 MW
- Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) 3.2 km · 2.3 MW
More Interactive data centers
- Interactive Brisbane Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.