Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)
Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is an operational data center operated by Equinix in Melbourne, Australia. Our footprint estimate of its power is about 2.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 2.3 MW (range 1.2 MW to 3.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,923 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 980 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix ME5 |
| Address | 22-36 Walsh Street, West Melbourne |
| Coordinates | -37.80794, 144.95354 |
| Website | equinix.com/locations/australia-colocation/melbourne-data-centers/me5 |
Power and grid
| Nearest high-voltage substation | West Melbourne Terminal Station, 220 kV, 1.8 km away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) use?
We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.
How close is Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is West Melbourne Terminal Station (220 kV), about 1.8 km away.
How clean is the power for Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?
Equinix.
Data centers near Melbourne
- Soul DataCentre 1.1 km · 1.1 MW
- 5GN Melbourne Data Centre (MDC) 1.1 km
- PIPE Networks Melbourne 1.3 km · 1.8 MW
- Powertel Data Centre 1.4 km · 2.1 MW
- Datacom Data Centre 2.0 km · 2.1 MW
- Southgate Melbourne 2.1 km · 57 MW
- NEXTDC M1 2.5 km · 10 MW
- Interactive Melbourne 3.2 km · 3.5 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.