Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)

Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is an operational data center operated by Equinix in Melbourne, Australia. Our footprint estimate of its power is about 2.3 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2.3 MW (range 1.2 MW to 3.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,923 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 980 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 2 internet exchanges
PeeringDB.
Also known asEquinix ME5
Address22-36 Walsh Street, West Melbourne
Coordinates-37.80794, 144.95354
Websiteequinix.com/locations/australia-colocation/melbourne-data-centers/me5

Power and grid

Nearest high-voltage substationWest Melbourne Terminal Station, 220 kV, 1.8 km away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) use?

We estimate the facility power at about 2.3 MW. Estimate from building footprint, low confidence.

How close is Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is West Melbourne Terminal Station (220 kV), about 1.8 km away.

How clean is the power for Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?

Equinix.