VicTrack data center in Newport is an operational data center operated by VicTrack in Newport, Australia. Our footprint estimate of its power is about 8.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | VicTrack |
| Facility power | 8.3 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,881 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -37.83211, 144.88491 |
Power and grid
| Nearest high-voltage substation | Brooklyn Terminal Station, 220 kV, 2.1 km away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does VicTrack data center in Newport use?
We estimate the facility power at about 8.3 MW. Estimate from building footprint, low confidence.
How close is VicTrack data center in Newport to the power grid?
The nearest high-voltage substation in OpenStreetMap is Brooklyn Terminal Station (220 kV), about 2.1 km away.
How clean is the power for VicTrack data center in Newport?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates VicTrack data center in Newport?
VicTrack.
Data centers near Newport
- Microsoft MEL05 2.7 km · 17 MW
- Equinix ME1/ME2 - Melbourne 2.9 km · 13 MW
- NEXTDC M3 3.6 km · 5.8 MW
- CDC Brooklyn Campus 4.0 km · 15 MW
- CDC Melbourne BK1 4.0 km
- NEXTDC M1 4.2 km · 10 MW
- Interactive Melbourne 4.4 km · 3.5 MW
- Soul DataCentre 6.2 km · 1.1 MW