Microsoft MEL05

Microsoft MEL05 is an operational data center operated by Microsoft in Altona North, Australia. Our footprint estimate of its power is about 17 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power17 MW (range 8.5 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,210 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft MEL04
AddressFrancis Street 385-397, 3012
Coordinates-37.82134, 144.85743

Power and grid

Nearest high-voltage substationBrooklyn Terminal Station, 220 kV, 700 m away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft MEL05 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

What chips does Microsoft MEL05 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft MEL05 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Brooklyn Terminal Station (220 kV), about 700 m away.

How clean is the power for Microsoft MEL05?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Microsoft MEL05?

Microsoft.

Data centers near Altona North

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.