Microsoft MEL05
Microsoft MEL05 is an operational data center operated by Microsoft in Altona North, Australia. Our footprint estimate of its power is about 17 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 17 MW (range 8.5 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,210 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft MEL04 |
| Address | Francis Street 385-397, 3012 |
| Coordinates | -37.82134, 144.85743 |
Power and grid
| Nearest high-voltage substation | Brooklyn Terminal Station, 220 kV, 700 m away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft MEL05 use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
What chips does Microsoft MEL05 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft MEL05 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Brooklyn Terminal Station (220 kV), about 700 m away.
How clean is the power for Microsoft MEL05?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Microsoft MEL05?
Microsoft.
Data centers near Altona North
- CDC Brooklyn Campus 1.3 km · 15 MW
- CDC Melbourne BK1 1.4 km
- NEXTDC M3 2.1 km · 5.8 MW
- VicTrack data center in Newport 2.7 km · 8.3 MW
- Equinix ME1/ME2 - Melbourne 5.1 km · 13 MW
- NEXTDC M1 6.5 km · 10 MW
- Interactive Melbourne 7.0 km · 3.5 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 7.4 km · 8.3 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.