Data Center Directory

NEXTDC M3

NEXTDC M3 is an operational data center operated by NEXTDC in West Footscray, Australia. Our footprint estimate of its power is about 5.8 MW.

Key facts

StatusOperational
OperatorNEXTDC
Facility power5.8 MW (range 2.3 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 48,201 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks, 1 internet exchanges
PeeringDB.
Also known asNEXTDC M3 Melbourne Data Centre Campus · NEXTDC M3 Melbourne Data Centre
Address27 Indwe St, West Footscray VIC 3012
Coordinates-37.80367, 144.86547
Websitenextdc.com

Power and grid

Nearest high-voltage substationBrooklyn Terminal Station, 220 kV, 2.5 km away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km1.8 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does NEXTDC M3 use?

We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.

How close is NEXTDC M3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Brooklyn Terminal Station (220 kV), about 2.5 km away.

How clean is the power for NEXTDC M3?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates NEXTDC M3?

NEXTDC.

Data centers near West Footscray

More NEXTDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.