NEXTDC S2 is an operational data center operated by NEXTDC in Macquarie Park, Australia. Our footprint estimate of its power is about 7.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NEXTDC |
| Facility power | 7.8 MW (range 3.9 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,459 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 25 networks, 3 internet exchanges PeeringDB. |
| Also known as | NEXTDC - S2 Sydney |
| Address | 6/8 Giffnock Ave |
| Coordinates | -33.78513, 151.12530 |
| Website | nextdc.com |
Power and grid
| Nearest high-voltage substation | Macquarie Park Zone Substation, 132 kV, 700 m away (Ausgrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney East Bulk Supply Substation, 330 kV, 10.1 km away |
| HV substations within 10 km | 27 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEXTDC S2 use?
We estimate the facility power at about 7.8 MW. Estimate from building footprint, low confidence.
How close is NEXTDC S2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Macquarie Park Zone Substation (132 kV), about 700 m away.
How clean is the power for NEXTDC S2?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates NEXTDC S2?
NEXTDC.
Data centers near Macquarie Park
- Intellicentre 2 (IC2) 510 m · 7.2 MW
- NEXTDC S1 572 m · 34 MW
- AWS Asia Pacific (Sydney) Region Data Centre 582 m · 15 MW
- Fujitsu North Ryde 632 m · 14 MW
- AirTrunk Sydney North 3.1 km · 26 MW
- NEXTDC S3 6.7 km · 13 MW
- Keppel Data Centres | Keppel DC Sydney 1 6.8 km · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 6.8 km · 4.5 MW
More NEXTDC data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.