Key facts
| Status | Operational |
|---|---|
| Operator | Keppel Data Centres |
| Facility power | 5.2 MW (range 2.6 MW to 8.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,330 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | NEXTDC S6 · NEXTDC - S6 Sydney |
| Address | 3 Broadcast Way, Artarmon |
| Opened | 2024 |
| Coordinates | -33.81934, 151.18594 |
| Website | keppeldatacentres.com |
Power and grid
| Nearest high-voltage substation | Royal North Shore Zone Substation, 132 kV, 200 m away (Ausgrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Haymarket Bulk Supply Substation, 330 kV, 7.1 km away |
| HV substations within 10 km | 36 |
| Power plants within 50 km | 179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Keppel Data Centres | Keppel DC Sydney 1 use?
We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.
How close is Keppel Data Centres | Keppel DC Sydney 1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Royal North Shore Zone Substation (132 kV), about 200 m away.
How clean is the power for Keppel Data Centres | Keppel DC Sydney 1?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Keppel Data Centres | Keppel DC Sydney 1?
Keppel Data Centres.
Data centers near Sydney
- DigiCo Sydney SYD2 (iseek GH) 81 m · 4.5 MW
- NEXTDC S3 84 m · 13 MW
- Telstra InfraCo - St Leonards Data Centre 511 m · 25 MW
- Syncom S4 687 m
- Data center in Artarmon 845 m
- AirTrunk Sydney North 4.0 km · 26 MW
- TPG Data Centre 5.2 km
- Powertel Data Centre 5.4 km
More Keppel Data Centres data centers
- Keppel Data Centres | Keppel DC Singapore 5 Singapore
- Keppel Data Centres | iSeek Data Centre Australia
- Keppel Genting Lane Campus Singapore
- Keppel Data Centres | Keppel DC Singapore 2 Singapore
- Keppel Data Centres | Keppel DC Singapore 4 Singapore
- Keppel Data Centres | Keppel DC Singapore 1 Singapore
- Keppel Data Centres | Basis Bay Data Centre Malaysia
- Keppel Data Centres | Cardiff Data Centre United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.