Data Center Directory

Keppel Genting Lane Campus

Keppel Genting Lane Campus is an operational data center operated by Keppel Data Centres in Geylang, Singapore. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
OperatorKeppel Data Centres
Facility power3.9 MW (range 1.6 MW to 9.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 32,631 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asKeppel DC Singapore 8 · Keppel DC Singapore 7
Opened2024
Coordinates1.32539, 103.87666
Websitekeppeldatacentres.com/locations/asia-pacific/singapore/keppel-dc-singapore-8

Power and grid

Nearest high-voltage substationKallang Bahru Substation 230kV, 230 kV, 900 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km19 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity497 g CO₂ per kWh (Singapore, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 91.1%, bioenergy 2.8%, solar 2.7%, oil and other fossil 2.5%, coal 0.9%. Clean power: 5.5%

Climate and water

Average temperature27.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,296 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.82 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayNoData (Singapore)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.

Satellite view

Questions

How much power does Keppel Genting Lane Campus use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.

How close is Keppel Genting Lane Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is Kallang Bahru Substation 230kV (230 kV), about 900 m away.

How clean is the power for Keppel Genting Lane Campus?

The grid in Singapore emits about 497 g CO₂ per kWh (2025). Largest sources: gas 91.1%, bioenergy 2.8%, solar 2.7%.

Who operates Keppel Genting Lane Campus?

Keppel Data Centres.

Data centers near Geylang

More Keppel Data Centres data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.