Data center in Artarmon
Data center in Artarmon is an operational data center in Artarmon, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | -33.81404, 151.19249 |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Data center in Artarmon?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Data centers near Artarmon
- Syncom S4 235 m
- Telstra InfraCo - St Leonards Data Centre 530 m · 25 MW
- Keppel Data Centres | Keppel DC Sydney 1 845 m · 5.2 MW
- DigiCo Sydney SYD2 (iseek GH) 876 m · 4.5 MW
- NEXTDC S3 907 m · 13 MW
- AirTrunk Sydney North 4.5 km · 26 MW
- TPG Data Centre 5.6 km
- Powertel Data Centre 5.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.