Telstra InfraCo - St Leonards Data Centre
Telstra InfraCo - St Leonards Data Centre is an operational data center operated by Telstra in St Leonards, Australia. Our footprint estimate of its power is about 25 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telstra |
| Facility power | 25 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,492 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Also known as | Telstra Data Centre |
| Address | 4A Herbert Street |
| Coordinates | -33.81872, 151.19143 |
| Website | telstrawholesale.com.au/products/data/telstra-infraco-data-centres.html |
Power and grid
| Nearest high-voltage substation | Royal North Shore Zone Substation, 132 kV, 300 m away (Ausgrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Haymarket Bulk Supply Substation, 330 kV, 7 km away |
| HV substations within 10 km | 36 |
| Power plants within 50 km | 179 MW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telstra InfraCo - St Leonards Data Centre use?
We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.
How close is Telstra InfraCo - St Leonards Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Royal North Shore Zone Substation (132 kV), about 300 m away.
How clean is the power for Telstra InfraCo - St Leonards Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Telstra InfraCo - St Leonards Data Centre?
Telstra.
Data centers near St Leonards
- Syncom S4 298 m
- DigiCo Sydney SYD2 (iseek GH) 495 m · 4.5 MW
- Keppel Data Centres | Keppel DC Sydney 1 511 m · 5.2 MW
- Data center in Artarmon 530 m
- NEXTDC S3 595 m · 13 MW
- AirTrunk Sydney North 4.5 km · 26 MW
- TPG Data Centre 5.1 km
- Powertel Data Centre 5.3 km
More Telstra data centers
- Telstra Australia
- Telstra Clayton Data Centre Australia
- Telstra Australia
- Telstra InfraCo - Clayton Data Centre Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.