Telstra Clayton Data Centre

Telstra Clayton Data Centre is an operational data center operated by Telstra in Clayton, Australia. Our footprint estimate of its power is about 5.9 MW.

Key facts

StatusOperational
OperatorTelstra
Facility power5.9 MW (range 2.9 MW to 9.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,891 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressDandenong Road 1822, 3168
Coordinates-37.92076, 145.13194

Power and grid

Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Telstra Clayton Data Centre use?

We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.

How clean is the power for Telstra Clayton Data Centre?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Who operates Telstra Clayton Data Centre?

Telstra.