Telstra Clayton Data Centre
Telstra Clayton Data Centre is an operational data center operated by Telstra in Clayton, Australia. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Telstra |
| Facility power | 5.9 MW (range 2.9 MW to 9.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,891 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Dandenong Road 1822, 3168 |
| Coordinates | -37.92076, 145.13194 |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telstra Clayton Data Centre use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How clean is the power for Telstra Clayton Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Telstra Clayton Data Centre?
Telstra.
Data centers near Clayton
- Telstra InfraCo - Clayton Data Centre 273 m
- Fujitsu Noble Park 5.6 km · 4.5 MW
- DXC Technology 7.6 km · 8.3 MW
- Vocus DC-MEL04 Mitcham Data Centre 12.1 km · 3.1 MW
- Hansen Technologies DataCentreCX 14.8 km
- AAPT Richmond (Melbourne) 15.6 km · 3.9 MW
- Southgate Melbourne 18.2 km · 57 MW
- Datacom Data Centre 18.4 km · 2.1 MW
More Telstra data centers
- Telstra InfraCo - St Leonards Data Centre Australia
- Telstra Australia
- Telstra Australia
- Telstra InfraCo - Clayton Data Centre Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.