Data Center Directory

DXC Technology

DXC Technology is an operational data center in Vermont South, Australia. Our footprint estimate of its power is about 8.3 MW.

Key facts

StatusOperational
Facility power8.3 MW (range 4.1 MW to 13 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,916 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWesley Court 4, 3151
Coordinates-37.85736, 145.16523

Power and grid

Nearest high-voltage substationRingwood Terminal Station, 220 kV, 6 km away (AusNet)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km2.1 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity518 g CO₂ per kWh (Australia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8%

Climate and water

Average temperature14.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.9 °C (2001 to 2025)
Cooling degree days279 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayHigh (40-80%) (Victoria)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does DXC Technology use?

We estimate the facility power at about 8.3 MW. Estimate from building footprint, low confidence.

How close is DXC Technology to the power grid?

The nearest high-voltage substation in OpenStreetMap is Ringwood Terminal Station (220 kV), about 6 km away.

How clean is the power for DXC Technology?

The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.

Data centers near Vermont South

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.