Hansen Technologies DataCentreCX
Hansen Technologies DataCentreCX is an operational data center operated by Hansen Technologies Doncaster in Doncaster, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Hansen Technologies Doncaster |
| Address | 2 Frederick Street |
| Coordinates | -37.78811, 145.12750 |
| Website | hansencx.com/solutions/datacentrecx |
Power and grid
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Hansen Technologies DataCentreCX?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Hansen Technologies DataCentreCX?
Hansen Technologies Doncaster.
Data centers near Doncaster
- Vocus DC-MEL04 Mitcham Data Centre 6.5 km · 3.1 MW
- DXC Technology 8.4 km · 8.3 MW
- AAPT Richmond (Melbourne) 11.1 km · 3.9 MW
- Telstra InfraCo - Clayton Data Centre 14.5 km
- Telstra Clayton Data Centre 14.8 km · 5.9 MW
- Southgate Melbourne 14.9 km · 57 MW
- Powertel Data Centre 15.0 km · 2.1 MW
- Datacom Data Centre 15.1 km · 2.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.