Telstra InfraCo - Clayton Data Centre is an operational data center operated by Telstra in Clayton, Australia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Telstra |
| Networks | 1 networks, 1 internet exchanges PeeringDB. |
| Address | 1822 Dandenong Road |
| Coordinates | -37.91849, 145.13311 |
| Website | infraco.telstra.com.au/solutions/data-centre-colocation |
Power and grid
| Nearest high-voltage substation | Springvale Terminal Station, 220 kV, 1.6 km away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 2.1 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Telstra InfraCo - Clayton Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Springvale Terminal Station (220 kV), about 1.6 km away.
How clean is the power for Telstra InfraCo - Clayton Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Telstra InfraCo - Clayton Data Centre?
Telstra.
Data centers near Clayton
- Telstra Clayton Data Centre 273 m · 5.9 MW
- Fujitsu Noble Park 5.6 km · 4.5 MW
- DXC Technology 7.4 km · 8.3 MW
- Vocus DC-MEL04 Mitcham Data Centre 11.8 km · 3.1 MW
- Hansen Technologies DataCentreCX 14.5 km
- AAPT Richmond (Melbourne) 15.5 km · 3.9 MW
- Southgate Melbourne 18.1 km · 57 MW
- Datacom Data Centre 18.3 km · 2.1 MW
More Telstra data centers
- Telstra InfraCo - St Leonards Data Centre Australia
- Telstra Australia
- Telstra Clayton Data Centre Australia
- Telstra Australia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.