Vocus DC-MEL04 Mitcham Data Centre
Vocus DC-MEL04 Mitcham Data Centre is an operational data center in Mitcham, Australia. Our footprint estimate of its power is about 3.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.1 MW (range 1.5 MW to 4.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,569 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Thornton Crescent 28, 3132 |
| Coordinates | -37.82143, 145.18773 |
Power and grid
| Nearest high-voltage substation | Ringwood Terminal Station, 220 kV, 2.4 km away (AusNet) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Power plants within 50 km | 2.1 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 14.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.9 °C (2001 to 2025) |
| Cooling degree days | 279 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | High (40-80%) (Victoria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vocus DC-MEL04 Mitcham Data Centre use?
We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.
How close is Vocus DC-MEL04 Mitcham Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Ringwood Terminal Station (220 kV), about 2.4 km away.
How clean is the power for Vocus DC-MEL04 Mitcham Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Data centers near Mitcham
- DXC Technology 4.5 km · 8.3 MW
- Hansen Technologies DataCentreCX 6.5 km
- Micron21 Data Centre 11.1 km · 0.5 MW
- Telstra InfraCo - Clayton Data Centre 11.8 km
- Telstra Clayton Data Centre 12.1 km · 5.9 MW
- Fujitsu Noble Park 14.1 km · 4.5 MW
- AAPT Richmond (Melbourne) 15.8 km · 3.9 MW
- Southgate Melbourne 19.7 km · 57 MW